Temperature Control Cables: Installation: Notes
- Position the temperature control cable through the instrument panel heater-A/C control opening.
- Reach through the instrument panel center air duct opening to access and reconnect the temperature control cable end to the blend-air door lever.
- Install and tighten the screw that secures the temperature control cable housing retainer to the top of the heater-A/C unit housing. Tighten the screw to 2.3 N.m (20 in. lbs.).
- Reinstall the heater-A/C control into the instrument panel. (Refer to - HEATING & AIR CONDITIONING/CONTROLS/A/C HEATER CONTROL - INSTALLATION ).
- Install the instrument panel center stack bezel (Refer to INSTRUMENT PANEL ASSEMBLY ).
- Reconnect the battery negative cable.