LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 1986 >> Charger Base, 1.6 A >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.6L Eng, w/Air Cond5.4A
1.6L Eng, w/o Air Cond5.2A
Additional Procedure: VALVE: Grind Complete:
Where Air Pump interferes add0.30.3A
Where Pwr Strg Interferes add0.20.2A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
1.6L Eng, Both0.7B
1.6L Eng, One Shaft0.5B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A