Pump, Water: Installation: 5.7L/6.4L
- Clean and inspect the mating surfaces of the timing chain cover (1) and the water pump.
- Install the water pump (3). Tighten bolts (6) to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Install the upper stud bolt (2). Tighten bolt to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Install the lower radiator hose to the water pump.
- Install the upper radiator hose to the thermostat housing (1).
- Install the belt tensioner assembly (4). Tighten the bolt to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Install the idler pulley (5). Tighten the bolt to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Connect the temperature sensor wire hire harness connector (2).
- Using a new O-ring seal, install heater tube (3). Tighten bolt (1) to the proper torque specifications. Refer to TORQUE SPECIFICATIONS .
- Install the serpentine belt. Refer to BELT, SERPENTINE, INSTALLATION .
- Install the cooling fan assembly. Refer to FAN, COOLING, INSTALLATION .
- Install the air cleaner body. Refer to BODY, AIR CLEANER, INSTALLATION .
- Connect the negative battery cable.
- Evacuate the air and refill cooling system. Refer to STANDARD PROCEDURE .
- Check the cooling system for leaks. Refer to DIAGNOSIS AND TESTING .