LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2017 >> 200 LX, Eng CD ED6 >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Distribution >> Center, Power Distribution (PDC) >> Installation >> Installation - Power Distribution Z-Case Fuse Array

Installation - Power Distribution Z-Case Fuse Array

GC0160052Courtesy of CHRYSLER GROUP, LLC
  1. Position the Z-case fuse array to the Power Distribution Center (PDC).
  2. Press the Z-case down into position until the tabs (3) snap around the outer edges of the array indicating the array is firmly seated.
  3. Install and tighten the screw (1) that secures the fuse array to the PDC case and tighten the screw to 9 N.m (80 In. Lbs.).
  4. Connect all power feeds to their proper locations.
  5. Secure the feeds to their posts (2) and tighten the screws to 9 N.m (80 In. Lbs.).
  6. Install the PDC cover into proper position on the PDC assembly.
  7. Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.