Charging System (Service Information): Generator: Removal: 3.5L

Fig 1: 3.5L GENERATOR ELECTRICAL CONN.
GC0120979Courtesy of CHRYSLER LLC
CAUTION: Never force a belt over a pulley rim using a screwdriver. The synthetic fiber of the belt can be damaged.
  1. Disconnect and isolate negative battery cable.
  2. Remove generator drive belt. Refer to Cooling/Accessory Drive/BELT, Serpentine - Removal .
  3. Unsnap plastic protective cover (4) from B+ mounting stud.
  4. Remove B+ terminal mounting nut (3) and B+ terminal (2) at top of generator.
  5. Disconnect field wire electrical connector (1) by pushing on connector tab.
    Fig 2: 3.5L GENERATOR R AND I
    GC0120980Courtesy of CHRYSLER LLC
  6. Remove short mounting bolt (3) from generator (1).
  7. Remove long mounting bolt (2) from generator (1).
  8. Remove generator (1) from engine mounting bracket.