LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> Sebring Base, 2D Convertible, EDG >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Engine & Automatic Transmission Cooling System >> Engine >> PUMP, Water >> Installation >> 2.7L Engine

2.7L Engine

Fig 1: Water Pump - 2.7L Engine
GC0095210Courtesy of CHRYSLER LLC
1 - WATER PUMP
2 - BOLTS
3 - BOLTS
  1. Clean all sealing surfaces.
  2. Install water pump (1) and gasket. Tighten mounting bolts to 12 N.m (105 in. lbs.).
  3. Install timing chain guides and timing chain.
  4. Install the accessory drive belts. See Cooling/Accessory Drive/BELT, Serpentine - Installation .
  5. Install the radiator fan assembly. See Cooling/Engine/FAN, Cooling - Installation .
  6. Evacuate air and refill cooling system. See Cooling/Engine/PUMP, Water - Standard Procedure .
  7. Check cooling system for leaks. See Cooling - Standard Procedure .