Charging System (Service Information): Generator: Installation: 3.5L
Courtesy of CHRYSLER LLC
- Install generator.
- Install mounting bolts and tighten to 26 N.m (19 ft. lbs.).
Courtesy of CHRYSLER LLC
- Install battery cable. Tighten nut to 10 N.m (88.5 in. lbs.)
- Connect electrical connector to generator.
- Install access drive belt. Refer to Cooling/Accessory Drive/BELT, Serpentine - Installation
.
- Install negative battery cable remote terminal onto remote battery post. Tighten nut to 16.5 N.m (12 ft. lbs.).