Power Transfer Unit

WARNING: This page is about a different variant/trim than selected.
Fig 1: O-Ring At PTU
GC0050375Courtesy of CHRYSLER LLC
  1. Install new O-ring onto PTU.
  2. Apply RTV, 05010884AA, to the PTU O-ring.
    Fig 2: Removing/Installing Power Transfer Unit
    GC0050374Courtesy of CHRYSLER LLC
    NOTE: The sequence below should always be followed when installing the PTU
  3. Install PTU into position.
  4. Install PTU-to-transmission adapter bolts (2) and tighten to 22 N.m (30 ft. lbs.).
  5. Check and adjust PTU Fluid level. The PTU holds.8L (1.7 Pints.) of Mopar® 75W-90 Gear and Axle Lubricant.
    Fig 3: Heat Shield Bolts And Clips
    GC0060706Courtesy of CHRYSLER LLC
  6. Install the PTU Heat shield (3).
  7. Install PTU-to-transaxle mount bracket upper bolts (1) and tighten to 54 N.m (40 ft. lbs.).
    Fig 4: Lower Heat Shield Bolt
    GC0060707Courtesy of CHRYSLER LLC
  8. Install the lower heat shield bolt (2) and tighten to 22 N.m (30 ft. lbs.).
    Fig 5: Rear Transmission Bracket To Transmission Bolts
    GC0060705Courtesy of CHRYSLER LLC
  9. Install transmission rear mount bolts (2) and tighten to 54 N.m (40 ft. lbs.).
  10. Install propeller shaft assembly. Refer to INSTALLATION .
  11. Install exhaust to engine. Refer to INSTALLATION .
  12. Install the crossmember. Refer to INSTALLATION .
  13. Install right halfshaft assembly. Refer to INSTALLATION .