LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2008 >> PT Cruiser Base, 2D Convertible, 2.4 X, Automatic >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Engine & Automatic Transmission Cooling System >> Engine >> Container-Coolant Recovery >> Installation >> Installation-Diesel Engine

Installation-Diesel Engine

Fig 1: Coolant Recovery Pressure Container
GC0040986Courtesy of CHRYSLER LLC
1 - COOLANT RECOVERY PRESSURE CONTAINER
2 - DASH PANEL
3 - COOLANT HOSE
4 - RETAINING BOLTS
5 - RETAINING NUT
  1. Lower container into engine compartment and connect coolant hose (3)at bottom of container (1).
  2. Position container on dash panel, install fasteners (4, 5) and torque to 2-3N.m (25-40 lbs. in.).
  3. Connect coolant bypass hose to coolant recovery pressure container.
  4. Reposition fuel filter assembly bracket and install fasteners.
  5. Refill cooling system. See SYSTEM FILLING-GAS ENGINE  .
  6. Install engine cover. Refer to INSTALLATION .
  7. Connect negative battery cable.