LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2007 >> Sebring Base, 2.4 K >> Repair and Diagnosis >> External Pages >> Different car >> Section 237 (Emissions Control System) >> Air Injection >> PUMP, Air >> Installation >> Installation

PUMP, Air: Installation: Installation

WARNING: This page is about a different car, the 2010 Dodge Avenger and 2010 Chrysler Sebring. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: PUMP TO BRACKET
GC0123415Courtesy of CHRYSLER LLC
  1. Install air pump (3) to bracket (4).
  2. Install air pump mounting nuts (5) to bracket (4). Tighten the nuts to 8 N.m (71 in. lbs.).
  3. Connect electrical harness connector (1) to the air pump electrical connector (2).
    Fig 2: HEAT SHIELD
    GC0123414Courtesy of CHRYSLER LLC
  4. Install heat shield (3) and bolt (1) to air pump bracket (2). Tighten the bolt to 8 N.m (71 in. lbs.).
    Fig 3: RELAY
    GC0123413Courtesy of CHRYSLER LLC
  5. Install relay, heat shield (2) and bolt (1) to air pump bracket (3). Tighten the bolt to 8 N.m (71 in. lbs.).
    Fig 4: AIR INLET TUBE AT AIR PUMP
    GC0123412Courtesy of CHRYSLER LLC
    NOTE: The quick connect fitting on the air inlet tube is slotted to fit the air pump housing fitting. Line the slot up when making the connection.
  6. Install air inlet tube (3) to air pump housing connection (2). A click noise will indicate a good connection.
  7. Connect the negative battery cable, tighten the nut to 5 N.m (45 in. lbs.).