Installation-2.0L Diesel
| 1 - TURBOCHARGER CLAMP |
| 2 - BOLT |
| 3 - CATALYTIC CONVERTER |
| 4 - GASKET |
NOTE:
Always work from the front to rear of exhaust system when aligning and tightening exhaust system components.
- Clean cross-under to catalytic converter sealing surfaces.
- Position new gasket (4) turbocharger clamp (1) on Catalytic converter (3).
- Loosely attach catalytic converter to Turbocharger.
- Install catalytic converter mounting bolt (2)
1 - ISOLATOR 2 - MUFFLER/RESONATOR ASSEMBLY 3 - CATALYTIC CONVERTER 4 - BAND CLAMP - Loosely install muffler/resonator assembly (2) to catalytic converter (3).
- Install support isolators to muffler supports.
- Align exhaust system to maintain position and proper clearance with underbody parts. All support isolators should have equal load on them.
- Tighten turbocharger clamp to 28 N.m (250 in. lbs.). Tighten resonator/pipe assembly band clamp (4) to 54 N.m (40 ft. lbs.). Tighten catalytic converter bolt to 54 N.m (40 ft. lbs.).
- Connect ground strap to muffler.
- Lower vehicle.
- Start the engine and inspect for exhaust leaks. Repair exhaust leaks as necessary.
- Check the exhaust system for contact with the body panels. Make the necessary adjustments, if needed.