Diagnostic Test
- 1) ASD RELAY OPERATION
Ignition on, engine not running.
With a scan tool, actuate the ASD Relay.
Is the ASD Relay operating?
Yes
- Refer to INTERMITTENT CONDITION .
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
No
- Go To step 2).
- 2) (A922) FUSED B+ CIRCUITS
Turn the ignition off.
Remove the ASD Relay from the IPM.
Using a 12-volt test light connected to ground, probe the (A922) Fused B+ circuits in the IPM.
Does the test light illuminate brightly?
Yes
- Go To step 3).
No
- Repair the open or short to ground in the (A922) Fused B+ circuits. Inspect and replace any open fuses.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 3) ASD RELAY
Measure the resistance of the ASD Relay Coil.
Is the resistance between 60 to 80 ohms?
Yes
- Go To step 4).
No
- Replace the ASD Relay.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 4) (K51) ASD RELAY CONTROL CIRCUIT OPEN
Disconnect the PCM harness connectors.
CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.Measure the resistance of the (K51) ASD Relay Control circuit from the IPM to the appropriate terminals of special tool #8815.
Is the resistance below 5.0 ohms?
Yes
- Go To step 5).
No
- Repair the open in the (K51) ASD Relay Control circuit.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
- 5) (K51) ASD RELAY CONTROL CIRCUIT SHORTED TO GROUND
Measure the resistance between ground and the (K51) ASD Relay Control circuit in the IPM.
Is the resistance below 100 ohms?
Yes
- Repair the short to ground in the (K51) ASD Relay Control circuit.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
No
- Go To step 6).
- 6) PCM NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.
Were there any problems found?
Yes
- Repair as necessary.
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .
No
- Replace and program the Powertrain Control Module. Refer to MODULE-POWERTRAIN CONTROL .
- Perform NGC POWERTRAIN VERIFICATION TEST VER - 5 .