4. Apps #1 Signal Circuit Shorted To 5-Volt Supply Circuit
Turn the ignition off.
Measure the resistance of the APPS #1 Signal circuit and the 5-Volt Supply circuit at the APPS harness connector.
Fig 1: Measuring Resistance Of APPS #1 Signal Circuit At 5-Volt Supply Circuit At APPS Harness Connector
Is the resistance below 100 ohms?
- Yes >> Repair the APPS #1 Signal circuit for a short to the 5-Volt Supply circuit.
- No >> Go To 5