LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 1986 >> New Yorker 2.5 K >> Labor Times >> Other Variant >> Electrical >> Starter >> Starter Assembly >> Remove, Install, and Overhaul

Starter Assembly: Remove, Install, and Overhaul

WARNING: This page is about the New Yorker 2.2 E, which is a different variant/trim than selected.
Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.2L Eng,Turbocharger3.5B
Combination Procedure: STARTER FIELD COILS: Remove, Install, and Overhaul:
0.5B