LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 1983 >> Fifth Avenue 3.7 H >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line6, w/Air Cond8.2A
In-Line6, w/o Air Cond7.7A
Additional Procedure: VALVE: Grind Complete:
w/100 Amp Alternator add0.4A
Where Air Pump interferes add0.5A
Where Pwr Strg interferes add0.2A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
In-Line60.5B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A