Transmission Assembly: Remove, Install, and Overhaul
WARNING: This page is about the Express 2500 Base, Van Cargo, 4.3L Eng VIN P, Gas, which is a different variant/trim than selected.
Includes: Inspect and replace all necessary components, clean and check Converter, flush Oil Cooler Lines, adjust and road test.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| V6,8 Spd Trans | Includes: Programming. | 15.0 | A | |
| Combination Procedure: FLYWHEEL: Remove & Replace: | ||||
| V6,8 Spd Trans | 0.3 | C | ||