LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2018 >> Bolt EV Premier >> Repair and Diagnosis >> Hybrid/Electric Powertrain >> Cooling Systems >> Hybrid/EV System Heating And Cooling >> Diagnostic Information and Procedures >> DTC P1EC6 >> Circuit/System Testing

Circuit/System Testing

WARNING:

Always perform the High Voltage Disabling procedure prior to servicing any High Voltage component or connection. Personal Protection Equipment (PPE) and proper procedures must be followed.

The High Voltage Disabling procedure includes the following steps:

  • Identify how to disable high voltage.
  • Identify how to test for the presence of high voltage.
  • Identify condition under which high voltage is always present and personal protection equipment (PPE) and proper procedures must be followed.

Before working on any high voltage system, be sure to wear the following Personal Protection Equipment:

  • Safety glasses with appropriate side shields when within 15 meters (50 feet) of the vehicle, either indoors or outdoors.
  • Certified and up-to-date Class "0" Insulation gloves rated at 1000V with leather protectors.
    • Visually and functionally inspect the gloves before use.
    • Wear the Insulation gloves with leather protectors at all times when working with the high voltage battery assembly, whether the system is energized or not.

Failure to follow the procedures may result in serious injury or death.

  1. Vehicle OFF, disable the high voltage. Refer to High Voltage Disabling . Disconnect the high voltage harness connector at the E54 Hybrid/EV Battery Pack Coolant Heater.
  2. Test for 61 - 75 Ω between terminal A and terminal B at the E54 Hybrid/EV Battery Pack Coolant Heater.
    • If not within the specified range 

      Replace the T24 Battery Charger and the E54 Hybrid/EV Battery Pack Coolant Heater.

    • Go to next step: If within the specified range 
  3. NOTE:

    The following continuity tests must be performed using an EL-50772  Insulation Multimeter. Select the Isolation test setting, then select the 500 V range.

  4. With the EL-50772  set on the Isolation test setting, test for 26 - 550M Ω between the E54 Hybrid/EV Battery Pack Coolant Heater terminals listed below and the coolant heater assembly ground:
    • Terminal A
    • Terminal B
    • If less than the specified value 

      Replace the E54 Hybrid/EV Battery Pack Coolant Heater.

    • Go to next step: If within the specified value 
  5. Replace the T24 Battery Charger.