Installation Procedure
- Install Seal Ring (4)
- Install Manifold Absolute Pressure Sensor (3)
- Install Manifold Absolute Pressure Sensor Bolt (2) and tighten 10 N.m (89 lb in)
- Connect the electrical connector.(1)
- Install Fuel Feed Front Pipe (2)
- Remove all EN-6015 plugs from the connections.
- Connect Fuel Feed Front Pipe (2) @Fuel Injection Pump (1)
- Install Air Cleaner Resonator Bracket (2)
- Install Air Cleaner Resonator Bracket Bolt (1) and tighten 9 N.m (80 lb in)
- Install Wiring Harness Clip (3)
- Install Air Inlet Grille Panel Replacement
- Install Intake Manifold Cover Replacement
- Install Air Cleaner Outlet Duct Replacement
- Connect the negative battery cable. Battery Negative Cable Disconnection and Connection
CAUTION: