LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2017 >> SS Automatic Trans >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Diagnostic Information and Procedures >> Engine Cranks Slowly >> Circuit/System Verification

Circuit/System Verification

  1. Ignition OFF, measure and record the battery voltage at the C1 terminals. The voltage should be between 12.0 - 15.0 V.
  2. Verify that a test lamp illuminates between the M64 starter motor B+ terminal A X2 and ground.
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance.
  3. Test for less than 0.5 V between the positive battery cable and terminal A X2 at the M64 starter motor as ignition is switched to start position.
    • If greater than the specified value, replace the positive battery cable.
  4. Test for less than 0.5 V between the negative battery cable and the M64 starter motor case as ignition is switched to start position.
    • If greater than the specified value, replace the negative battery cable.
  5. Remove the drive belts. Refer to Drive Belt Replacement - Accessory
  6. Ignition start, verify the engine does not crank normal.
    • If the engine cranks normal, inspect the engine and belt drive system for mechanical binding, seized generator etc.
  7. If all circuits test normal, replace the M64 starter motor.