Installation Procedure
- Install the NEW catalytic converter (1) with a NEW gasket (2) and tighten the exhaust front pipe fasteners (3) to 43 N.m (32 lb ft).
- Install the exhaust service clamp (2) onto the exhaust muffler and the NEW catalytic converter. Tighten the exhaust clamp fasteners (1) to 50 N.m (37 lb ft).
- Inspect the exhaust system for leaks.
CAUTION:
Refer to Fastener Caution .