LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2016 >> Express 2500 LS, 4.8L Eng VIN F >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Express 2500 Base, Van Cargo, 4.8L Eng VIN F, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,Gas/Ethanol, w/Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.36.9A
V8,Gas/Ethanol, w/o Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.36.4A
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.2A