LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2013 >> Volt >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Controls/Fuel - 1.4L (LUU) - Repair Instructions >> Repair Instructions >> Secondary Air Injection Pump Replacement

Secondary Air Injection Pump Replacement

Fig 1: Secondary Air Injection Pump
GM2738642Courtesy of GENERAL MOTORS COMPANY
Secondary Air Injection Pump Replacement

Callout Component Name

Preliminary Procedures

  1. Remove the secondary air injection pump air cleaner hose. Refer to Secondary Air Injection Pump Air Cleaner Hose Replacement .
  2. Remove the secondary air injection pipe. Refer to Secondary Air Injection Pipe Replacement .
  3. Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle .
1 Secondary Air Injection Pump Bolt
CAUTION:

Refer to Fastener Caution .


Tighten 
22 N.m (16 lb ft)
2 Secondary Air Injection Pump Nuts (Qty: 2)
Tighten 
22 N.m (16 lb ft)
3 Secondary Air Injection Pump
Procedure 
Disconnect the electrical connector.