Installation Procedure
- Install the battery positive cable (3) to the back of the generator and tighten nut (2) to 20 N.m (15 lb ft).
- Install the battery positive cable (3) to the starter solenoid and tighten nut (2) to 12 N.m (9 lb ft).
- Install the battery negative cable to the starter and tighten the stud/nut (1) to 25 N.m (18 lb ft).
- Install the drivetrain and front suspension frame skid plate. Refer to Drivetrain and Front Suspension Frame Skid Plate Replacement .
- Install the battery negative cable nut (1) and the battery negative cable (2), to the chassis frame stud and tighten to 22 N.m (16 lb ft).
- Install the battery positive cable (2) to the battery positive cable extension cable junction block and tighten nut (1) to 12 N.m (9 lb ft).
- Install the battery tray. Refer to Battery Tray Replacement .
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
- Install the fuse block and battery positive cable cover.
CAUTION:
Refer to Fastener Caution .