Installation Procedure
- Install the generator (1).
- Install the 2 generator bolts (2) and tighten to 35 N.m (26 lb ft).
- Install the 2 generator wiring harness (2, 3) to the generator (1).
- Install the generator wiring harness nut (4) and tighten to 20 N.m (15 lb ft).
- Install the generator and air conditioning compressor belt. Refer to DRIVE BELT REPLACEMENT.
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection (without Start/Stop System) .
- Install the right tire and wheel assembly. Refer to Tire and Wheel Removal and Installation
- Close the hood.
CAUTION:
Refer to Fastener Caution.