LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2010 >> HHR SS, Automatic >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Controls And Fuel - 2.0L - Repair Instructions >> Repair Instructions >> Charge Air Cooler Inlet Pipe Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Charge Air Cooler Clamp
    GM2001828Courtesy of GENERAL MOTORS CORP.
    NOTE: Remove any oil film from inside the pipes.
  1. Attach the pipe retaining grommet to the engine bracket.
  2. Install the charge air cooler pipe (2) and tighten the charge air cooler inlet pipe clamp.
  3. Fig 2: View Of Charge Air Cooler Inlet Pipe
    GM2001806Courtesy of GENERAL MOTORS CORP.
    CAUTION: Refer to Fastener Caution .
  4. Raise the vehicle.

    Install the charge air cooler inlet pipe (2) to the charge air cooler (3).

    Tighten:  Tighten the clamp to 5 N.m (44 lb in).

  5. Install the front bumper fascia extension. Refer to Front Bumper Fascia Extension Replacement .