Repair Procedures
Perform the Diagnostic Repair Verification after completing the diagnostic procedure.
- Generator Replacement (LS4) or Generator Replacement (RPOs LZE/LZ4/LZ8)
- Control Module References for ECM replacement, setup, and programming
Perform the Diagnostic Repair Verification after completing the diagnostic procedure.