LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2009 >> HHR SS, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 261 (Power Steering System) >> Diagnostic Information and Procedures >> DTC C0460 >> Circuit/System Testing

Circuit/System Testing

WARNING: This page is about a different car, the 2010 Chevrolet HHR. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ignition OFF, disconnect the X2 harness connector at the PSCM.
  2. Ignition OFF, test for 10-200 ohms of resistance between terminal 1 and terminal 3.
    • If not within the specified range, test the exiting circuit and the exiting ground circuit for an open/high resistance or a short. If the circuits test normal, replace the electric power steering (EPS) motor.
  3. Ignition OFF, test for 3K-10K ohms of resistance between terminal 6 and terminal 3.
    • If not within the specified range, test the SIN circuit and the exciting ground circuit for an open/high resistance or a short. If the circuits test normal, replace the EPS motor.
  4. Ignition OFF, test for 6K-20K ohms of resistance between terminal 5 and terminal 3.
    • If not within the specified range, test the COS circuit and the exciting ground circuit for an open/high resistance or a short. If the circuits test normal, replace the EPS motor.
  5. Ignition OFF, test for greater than 1M ohms of resistance between terminal 3 and the motor flange.
    • If less than the specified value, test the exciting ground circuit for a short to ground. If the circuit tests normal, replace the EPS motor.
  6. If all circuits test normal, test or replace the PSCM.