LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2009 >> HHR LS, Standard >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Diagnostic Information and Procedures >> DTC P0562 >> Circuit/System Testing

Circuit/System Testing

  1. Engine running, accessories OFF, measure and record the battery voltage at the battery terminals. The voltage should be between 12.6 and 15.0 V.
  2. Ignition OFF, disconnect the harness connectors at the ECM.
  3. Ignition OFF and scan tool disconnected, open and close the driver door, and wait 1 minute. Test for less than 5 Ω between the ground circuit terminals listed below and ground.
    • Terminal 1 X2 (LNF)
    • Terminal 2 X2 (LNF)
    • Terminal 4 X2 (LNF)
    • Terminal 73 X2 (LE8/LE9)
    • If greater than the specified range, test the ground circuit for an open/high resistance.
  4. Verify that a test lamp illuminates between the B+ circuit terminals listed below and ground.
    • Terminal 56 X2 (LNF)
    • Terminal 20 X1 (LE8/LE9)
    • If the test lamp does not illuminate, test the B+ circuit for a short to ground or an open/high resistance.
  5. If all circuits test normal, replace the ECM.