Installation Procedure
WARNING: This page does not describe the selected car, but rather 8 other vehicles, including the 2011 GMC Yukon XL, 2011 GMC Yukon, 2011 Chevrolet Tahoe, 2011 Chevrolet Suburban, and 2011 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
- Install the ground strap to the vehicle.
- Install the ground strap terminal to the stud.
- Install the engine ground strap nut at the front plenum panel.
Tighten
Tighten the nut to 9 N.m (80 lb in).
- Position the ground strap to the rear of the left cylinder head.
Tighten
Tighten the bolt to 16 N.m (12 lb ft).
- Install the engine ground strap bolt to the rear of the left cylinder head.
- Install the upper intake manifold sight shield. Refer to Upper Intake Manifold Sight Shield Replacement .
CAUTION:
Refer to Fastener Caution .