LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2008 >> Chevy Express G3500, Van Passenger >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Replacement (Primary) >> Installation Procedure

Installation Procedure

    Fig 1: View Of Battery Hold-Down Retainer Bolt & Retainer
    GM1202786Courtesy of GENERAL MOTORS CORP.
  1. Install the battery into the battery carrier.
  2. NOTE: Refer to Fastener Notice .
  3. Install the battery hold-down retainer and bolt.

    Tighten:  Tighten the bolt to 25 N.m (18 lb ft).

  4. Fig 2: Battery & Cables
    GM1202776Courtesy of GENERAL MOTORS CORP.
  5. Connect the battery positive cable and the positive battery cable terminal to the battery. Refer to Battery Positive Cable Replacement (4.3L)  or Battery Positive Cable Replacement (4.8L, 5.3L and 6.0L)  or Battery Positive Cable Replacement (6.6L - Primary)  or Battery Positive Cable Replacement (6.6L - Auxiliary) .
  6. Connect the battery negative cable and the negative battery cable terminal to the battery. Refer to Battery Negative Cable Disconnection and Connection .
  7. Install the fender brace.