Preliminary Setup
WARNING: This page is about a different car, the 2006 Pontiac Montana SV6, 2006 Chevrolet Uplander, and 2006 Buick Terraza. However, it is still accessible from the selected car via links, so may be relevant.
- Raise and vehicle on a suitable support. Refer to Lifting and Jacking the Vehicle in General Information.
- Turn the ignition switch to OFF position.
- Remove all 4 tires, if necessary. Refer to Tire and Wheel Removal and Installation in Tires and Wheels.
- Connect the pressure bleeding tool according to the manufacturer's instructions.
- Turn the ignition switch to RUN position, engine off.
- Connect a scan tool and establish communications with the ABS system.
- Pressurize the bleeding tool to 206-241 kPa (30-35 psi).