Installation Procedure
NOTE:
Refer to FASTENER NOTICE
.
- Install the generator.
Tighten:
- Tighten the bolts to 50 N.m (37 lb ft).
- Tighten the nuts to 30 N.m (22 lb ft).
- Install the generator electrical connections.
- Install the drive belt. Refer to DRIVE BELT REPLACEMENT .
- Connect the negative battery cable. Refer to BATTERY NEGATIVE CABLE DISCONNECT/CONNECT PROCEDURE .