Installation Procedure
- If necessary install the junction block to the bracket assembly.
- Install the circuit breakers (4) and the relays to the junction block as required.
- Position the junction block to the I/P carrier.NOTE: Refer to FASTENER NOTICE in Cautions and Notices.
- Install the junction block screws.
Tighten: Tighten the screws to 10 N.m (89 lb in).
- Install the left I/P insulator. Refer to Closeout/Insulator Panel Replacement - Left in Instrument Panel, Gages, and Console.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure (RPOs LZE/LZ4/LZ9) or Battery Negative Cable Disconnect/Connect Procedure (RPO LS4) in Engine Electrical.