LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2005 >> Venture LS >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Starter Motor Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Locating Starter Motor & Bolts (LA1)
    GM211449Courtesy of GENERAL MOTORS CORP.
  1. Install the starter motor.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the starter motor bolts.

    Tighten:  Tighten the starter motor bolts to 47 N.m (35 lb ft).

  4. Install the torque converter cover. Refer to Torque Converter Cover Replacement (LA1) in Automatic Transaxle - 4T65-E.
  5. Fig 2: View Of Starter Motor BAT Terminal Nut And Electrical Leads (LA1)
    GM368799Courtesy of GENERAL MOTORS CORP.
  6. Install the starter motor S terminal electrical lead and nut.

    Tighten:  Tighten the starter motor solenoid S terminal nut to 3 N.m (27 lb in).

  7. Install the starter motor BAT terminal electrical leads and nut.

    Tighten:  Tighten the starter motor solenoid BAT terminal nut to 10 N.m (89 lb in).

  8. Install radiator air baffle assembly. Refer to Radiator Air Baffle Assemblies and Deflectors in Engine Cooling.
  9. Lower the vehicle.
  10. Install the battery ground (negative) cable to the battery. Refer to Battery Negative Cable Disconnect/Connect Procedure .