Installation Procedure
- Install the recirculation actuator levers (3, 6), if necessary.
- Install the recirculation actuator (7).
- Install the recirculation actuator bolts/screws (1).
Tighten: Tighten the screws to 1.2 N.m (11 lb in).
- Connect the recirculation actuator electrical connector (1).
- Install the upper I/P trim pad. Refer to Upper Trim Pad, Outer Trim Cover, Fuse Block Access Cover Replacement - Instrument Panel in Instrument Panel, Gages, and Console.
- Re-calibrate the actuators. Refer to Re-Calibrating Actuators .