Installation Procedure
WARNING: This page is about a different car, the 2010 Chevrolet Malibu. However, it is still accessible from the selected car via links, so may be relevant.
- Position the heat shield to the underbody and the dash panel.
- Install the heat shield nuts and tighten to 10 N.m (89 lb in).
- Install the left frame reinforcement (3).
- Install the left frame bolts (4). Tighten the bolts to 100 N.m (74 lb ft) plus an additional 90 degrees using the J-45059: meter.
- Raise the muffler pipe into position and install the first two muffler insulators onto the hangers.
- If equipped with a 3.5L or 3.6L engine, install the catalytic converters. Refer to Catalytic Converter Replacement - Left Side (LZ4) or Catalytic Converter Replacement - Left Side (LY7) and Catalytic Converter Replacement - Right Side (LZ4) or Catalytic Converter Replacement - Right Side (LY7) .
- If equipped with a 2.4L engine, install the exhaust manifold pipe. Refer to Catalytic Converter Replacement (LAT or LE5) or Catalytic Converter Replacement (LE5 or LE9 With MH8) .
CAUTION:
Refer to Fastener Caution
.