LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2005 >> Cobalt SS >> Labor Times >> Engine Mechanical >> Mechanical >> Crankshaft >> Remove & Replace

Engine Mechanical: Mechanical: Crankshaft: Remove & Replace

Includes: R&I Engine, replace Rod Bearings, Main Bearings, Front Crankshaft Seal and Rear Main Seal. Clean Oil Pan, Baffle Plate, and Oil Strainer.

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.0L EngDOES NOT include wheel alignment. Includes: R&I Subframe. Includes: Recover, Evacuate and Recharge Air Conditioning System. Includes: Bleed Clutch System.16.714.7A