LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2004 >> Venture Base, Van Passenger >> Repair and Diagnosis >> Electrical >> Body Electrical >> Wiring Systems - Introduction >> Repair Instructions >> Instrument Panel Electrical Center or Junction Block Replacement >> Installation Procedure

Installation Procedure

  1. Install the electrical connectors into the fuse block. Refer to Connector Repairs .
  2. Fig 1: View Of Fuse Block
    GM318292Courtesy of GENERAL MOTORS CORP.
  3. Align the rear side of the fuse block with the instrument panel.
  4. Push the fuse block into the opening until secure.
  5. Install the I/P end cover.
  6. Connect the battery negative cable. Refer to Battery Negative Cable Disconnect/Connect Procedure in Engine Electrical.