Installation Procedure
- Connect the negative battery cable.
- Install the TCM and retaining bolts.
Tighten: Tighten the TCM retaining bolts to 5 N.m (44 lb in) .
- Connect the TCM electrical connector.
- Connect the negative battery cable.
IMPORTANT:
After replacing the TCM, refer to Service Programming System (SPS)
to ensure the module has the latest calibrations.
NOTE:
Refer to Fastener Notice
in Cautions and Notices.