LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2003 >> Tracker 2D Utility, 4WD, Automatic >> Repair and Diagnosis >> Brakes >> Traction Control >> Antilock Brake System >> Repair Instructions >> ABS Automated Bleed Procedure >> Preliminary Setup

Preliminary Setup

  1. Raise and support the vehicle on a suitable support. Refer to LIFTING & JACKING VEHICLE in General Information.
  2. Turn the ignition switch to the OFF position.
  3. Connect the J 29532  according to the manufacturer's instructions.
  4. Turn the ignition switch to ON position, engine OFF.
  5. Connect a scan tool and establish communications with the ABS system.
  6. Remove all 4 tires, if necessary.
  7. Pressurize the bleeding tool to 35 psi.