LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Venture Plus >> Repair and Diagnosis >> Body & Frame >> Windows >> Door System, Mirror System & Window System >> Repair Instructions >> Roller Bracket Replacement - Upper >> Installation Procedure

Installation Procedure

  1. Install the sliding door upper roller bracket to the front edge of the upper track.
  2. Align the sliding door upper roller bracket to the grease pencil marks.
    NOTE: Refer to FASTENER NOTICE .
  3. Install the sliding door upper roller bracket bolts.

    Tighten 

    Tighten the sliding door upper roller bracket bolts to 10 N.m (89 lb in).

  4. Remove the support from the sliding door.
  5. Install the headliner trim finish molding. Refer to HEADLINING TRIM FINISH MOLDING REPLACEMENT .
  6. Install the sliding door garnish molding. Refer to GARNISH MOLDING REPLACEMENT - SLIDING DOOR .
    Fig 1: Installing Sliding Door Upper Roller Bracket & Bolts
    G01814070Courtesy of GENERAL MOTORS CORP.