LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> Venture Plus >> Repair and Diagnosis >> Body & Frame >> Exterior Body Panels >> Body Front End >> Repair Instructions >> Hood Hold-Open Rod Replacement >> Installation Procedure

Installation Procedure

Fig 1: Installing Bolt & Hood Prop Rod Base
G01813838Courtesy of GENERAL MOTORS CORP.
  1. Position the hood prop rod to the body.

    Ensure that the anti-rotation tab is located into the upper hole.

    NOTE: Refer to FASTENER NOTICE .
  2. Install the bolt to the hood prop rod base.

    Tighten 

    Tighten the bolts to 10 N.m (89 lb in).

  3. Install the coolant recovery reservoir. Refer to COOLANT RECOVERY RESERVOIR REPLACEMENT .
  4. Install the stow hood prop rod to the hold down retainer.
  5. Close the hood.