LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2002 >> TrailBlazer RWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Generator Replacement (4.2L Engine) >> Removal Procedure

Removal Procedure

  1. Disconnect the battery negative cable. Refer to Battery Negative Cable Disconnect/Connect Procedure .
  2. Remove the drive belt. Refer to DRIVE BELT REPLACEMENT in Engine Mechanical - 4.2L.
  3. Disconnect the battery positive cable nut (1) on the generator.
    Fig 1: Rear Of Generator (Alternator) View
    GM754357Courtesy of GENERAL MOTORS CORP.
  4. Remove the A/C line mounting bracket bolt at the engine life hook.
    Fig 2: View Of Engine Lift Hook
    GM754344Courtesy of GENERAL MOTORS CORP.
  5. Remove the right engine lift hook bolts and remove the lift hook.
    Fig 3: View Of Engine Lift Bracket
    GM750247Courtesy of GENERAL MOTORS CORP.
  6. Remove the 3 generator mounting bolts and remove the generator.
    Fig 4: View Of Generator & Mounting Bolts
    GM753668Courtesy of GENERAL MOTORS CORP.