LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 1991 >> Hi-Cube 7.4 N >> Repair and Diagnosis >> Body & Frame >> Power Windows >> Removal & Installation >> Run Channel >> Installation

Run Channel: Installation

  1. Install the run channel (226) to the vehicle. Work the run channel into the door frame. Be certain that the glass is in the channel. See Figure .
  2. Install lower door to run channel bolts (227). Raise the window completely. See Figure .
  3. Install the upper door to run channel bolt (225). See Figure . See TORQUE SPECIFICATIONS  .
  4. Install the inner and outer window weatherstrip (232 and 233). See Figure .
  5. Install the trim panel. See TRIM PANEL  .