LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 1982 >> RV Cutaway Automatic Trans, Trans Mfr CD 400/M40 >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
G30,V8,Gas,5.7L Eng33.0A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
V8,Gas,5.7L Eng, Where Air Cond interferes add1.71.7A
Where Air Pump interferes add0.5A
Where Cruise Control interferes add0.2A
Where Pwr Stg interferes add0.4A
Combination Procedure: CAMSHAFT BEARING: Remove & Replace:
NOTE: This operation applies to full circle, resistance fit bearings only. For split cap type bearings use Camshaft - R&R.
Each0.3A
Combination Procedure: OIL PUMP: Overhaul:
0.6B
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each0.2B
Combination Procedure: VALVE GUIDE: Remove & Replace:
Each0.2A