Installation Procedure
- Connect the wiring harness to the junction block base.
Position the junction block base (2) to the inner wheelhouse stud.
- Install the junction block base nut (1) and tighten to 22 N.m (16 lb ft).
- Install the electrical connectors to the front compartment fuse block housing.
Install the junction block to the base.
- Install the junction block bolts (1) and tighten to 7 N.m (62 lb in).
Position the positive battery cable to the junction block.
- Install the positive battery cable nut (1) and tighten to 12 N.m (106 lb in).
Install the electrical steering wiring harness (1).
Install both front compartment fuse block covers (1, 2).
- Install the windshield washer solvent container filler tube. Refer to Windshield Washer Solvent Container Filler Tube Replacement .
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution .