Installation Procedure
- Install the generator.
- Install the upper generator bolt.
Tighten: Tighten the generator bolts to 50 N.m (37 lb ft).
- Install the idler pulley assembly (3) and bolt (1).
- Install the nut (2).
Tighten the generator fasteners to the following torque values:
Tighten:
- Tighten the idler pulley bolt (1) to 50 N.m (37 lb ft).
- Tighten the idler pulley nut (2) to 50 N.m (37 lb ft).
- Install the starter cable terminal to the generator:
- Install the starter cable terminal to the stud.
- Install the starter cable nut (2).
Tighten: Tighten the starter cable nut to 20 N.m (15 lb ft).
- Slide the boot (1) over the generator stud (4).
- Position the generator coolant hose assembly to the generator and secure with the bolt.
Tighten: Tighten the bolt to 27 N.m (20 lb ft).
- Connect the generator electrical connector (1).
- Install the front suspension crossmember. Refer to Front Suspension Crossmember Replacement .
- Fill the cooling system. Refer to Draining and Filling Cooling System (GE 47716) or Draining and Filling Cooling System (Static Fill) .
- Connect the negative battery cable (2). Refer to Battery Negative Cable Disconnection and Connection .
- Install the generator drive belt. Refer to DRIVE BELT REPLACEMENT .
NOTE:
Refer to Fastener Notice
.