Installation Procedure
- Position the battery heat shield downward over the battery.
- Ensure that the heat shield locking tabs (1) are engaged.
- Install the air inlet grille panel. Refer to Air Inlet Grille Panel Replacement .
- Connect the battery positive cable (1) to the battery.
Tighten: Tighten the battery positive cable to 17 N.m (13 lb ft).
- Connect the battery negative cable (2). Refer to Battery Negative Cable Disconnection and Connection .
IMPORTANT:
Ensure the openings in the heat shield are aligned with the battery terminal bosses.
NOTE:
Refer to Fastener Notice
.