Installation Procedure
- While the exhaust system is on the floor complete the following:
- Apply a soapy solution to the following in order to ease the installation of the hangers:
- The inner diameter of the front exhaust hangers (2)
- The exhaust pipe hanger rods (3)
- The inner diameter of the tail pipe hangers
- The tail pipe hanger rods (1)
- Press the front exhaust hangers over the exhaust pipe hanger rods.
- Apply a soapy solution to the following in order to ease the installation of the hangers:
- Place NEW seals on the catalytic converter flanges.
- With the aid of an assistant, raise the exhaust system into position, aligning the exhaust pipe flanges with the studs located in the rear of the catalytic converters.
- Finger tighten the exhaust pipe nuts to the catalytic converter studs.
- Press the tail pipe hangers (1) over the tail pipe hanger rods.
- Press the front exhaust hangers (1) over the rear suspension hanger rods.
- Tighten the exhaust pipe nuts.
Tighten: Tighten the nuts to 30 N.m (22 lb ft).
- Position the floor panel tunnel brace to the floor panel.
- Install the 2 bolts securing the floor panel tunnel brace to the floor panel.
Tighten: Tighten the bolts to 25 N.m (18 lb ft).
- Lower the vehicle.
NOTE:
Refer to Exhaust System Inspection Notice
.
NOTE:
Refer to Fastener Notice
.