Repair Verification
- Lower the EVAP purge canister to gain access to the EVAP vent inlet, and seal it, using a suitable plug or a plug from the J 41413-300 . See Special Tools .
- Turn the nitrogen/smoke valve to nitrogen.
- Use the remote switch to activate the J 41413-200 . See Special Tools .
- Use the remote switch to introduce nitrogen and fill the EVAP system until the floating indicator stabilizes.
- Verify the flow meter's stable floating indicator position is at or below the red flag.
- Clear the DTCs with a scan tool.